Employer: Ministry of Transport and Infrastructure -
General Directorate of Highways
Contract Date: 10.11.2018
Project Cost: 60,000,000 USD
Project Duration: Ongoing
Project Details: The scope of the project includes a tunnel of
8,500 meters, the same width as the highway, and a bridge of 640
meters, with a total length of 15,000 meters, including 2 lanes for
roundtrip, and 60% of the construction works have been
completed.
Employer: Ministry of Environment, Urbanization and Climate ChanGeneral Directorate of Bank of Provinces
Contract Date: 19.01.2023
Project Cost: 11.500.000 USO
Project Duration: Ongoing
Project Details: The scope of work includes 3,500 meters of 600
mm diameter steel pipe transmission line, 500 cubic meter
capacity water tank, 2,800 cubic meter/hour capacity Treatment
Facilities and Landscaping and has been completed at 35% level.
Employer: Trabzon Governorship Investment Monitoring and Coordination
Directorate
Contract Date: 19.12.2022
Project Cost: 1.000.000 USO
Project Duration: Ongoing
Project Details: The total construction area is 1600 m2, consists of
23 Classrooms, laboratories and administrative sections and is
75% completed.
Employer: Ministry of Environment, Urbanization and Climate
Change
Contract Date: 15.11.1991
Project Cost: 6,000,000-US Dollars
Completion Date: 07.07.1997
Employer: Ministry of Youth and Sports/ Ankara
Contract Date: 29.05.2014
Project Cost: 4.508.813,39 USD
Completion Date: 18.11.2016
Employer: Ministry of Environment, Urbanization and Climate Change - General Directorate of Bank of Provinces
Contract Date: 23.05.2013
Project Cost: 5.696.216,21 USO
Completion Date: 06.07.2018
Employer: Ministry of Public Works and Settlem
Contract Date: 01.01.1999
Project Cost: 4.249.210,6 USD
Completion Date: 04.09.2003
Employer: Ministry of Environment, Urbanization and Climate Change
General Directorate of Bank of Provinces
Contract Date: 28.06.2012
Project Cost: 1,501,180.66 USO
Completion Date: 18.06.2005
At Delaws, we have years of experience working with businesses of all sizes. Our team of experts has the knowledge and expertise necessary to provide top-notch business development services.
lraq/Basrah's commissioned largest desalination plant for
human consumption...
manufactured and commissioned by Aquamatch in 2021.
large-capacity desalination plant in the country.
The first large-scale OARO Plant in the world is under
construction in Indonesia to be completed by Q1 of 2023.
The plant will produce 25.000 m/3 /day of desalinated water
and 220,000 tons per year of food grade sea salt.
The desalination part is designed, manufactured and
shipped by Aquamatch and OARO part skids production
will be completed by Aquamatch in 2022.
Aquamatch is in charge of engineering, supply and
commissioning the plant.
The Desalination & demineralisation plant with 12.000 m/3/ day capacity is designed, manufactured and installed as
turn-key by Aquamatch in 2015.
The water treatment system consists of Ultrafiltration, Seawater Reverse Osmosis, 2. Pass Reverse Osmosis
and Electrodeionization systems.